Al-Mashaaer al-Mugaddassah Metro Line has a passenger capacity of 360,000 pilgrims across more than two thousand trips over seven days. The metro, which launched its first trip in 2010, connects the holy sites starting from the Arafat Holy Site to the Jamarat Bridge, passing through Muzdalifah Holy Site. Its railway spans twenty km and operates with seventeen trains, all of which are controlled by automated systems. Each train consists of twelve carriages, totaling 204 carriages, each accommoda...